Method of producing polycarbonate-based polymer microparticles comprising contacting an emulsion with a poor solvent, and polycarbonate-based polymer microparticles

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9567443
APP PUB NO 20150024205A1
SERIAL NO

14375262

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of producing polycarbonate-based polymer microparticles including forming an emulsion in a system in which a polycarbonate-based polymer (A), a polymer (B) different from the polycarbonate-based polymer (A) and an organic solvent (C) are dissolved and mixed together and which causes phase separation into two phases of a solution phase having the polycarbonate-based polymer (A) as its main component and a solution phase having the polymer (B) different from the polycarbonate-based polymer (a) as its main component, and contacting a poor solvent for the polycarbonate-based polymer (A) with the emulsion at a temperature of 80° C. or higher to thereby precipitate microparticles of the polycarbonate-based polymer (A).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TORAY INDUSTRIES INCJAPAN'S TOKYO CENTRAL NIHONBASHI MUROMACHI 2 CHOME 1 NO 1 TOKYO TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Asano, Itaru Nagoya, JP 21 100
Takezaki, Hiroshi Nagoya, JP 38 313

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 14, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00