Method for producing a semi-finished product or component comprising a metal carrier and a hardenable coating with fiber-reinforced plastic

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9566745
APP PUB NO 20150298399A1
SERIAL NO

14391813

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method for producing a semi-finished product or component (2), in which a hardenable coating (6, 17) with fiber-reinforced plastic is applied to a metal carrier (3), particularly a metal sheet (4), and the coated metal carrier (3) is formed, particularly deep-drawn or bent, in a subsequent step to produce a semi-finished product or component (2). According to the invention, for an improved and cost-effective method, the metal carrier (3) is coated at most only in certain regions and is only subjected to the forming when the coating thereof (6, 17) has hardened to produce at least a block-resistant surface (12), the coated metal carrier (3) being formed such that the plastic changes in shape follow forming radii (21) and are produced substantially, preferably exclusively, in the coating-free regions (15) of the metal carrier.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VOESTALPINE STAHL GMBHAUSTRIA LENZING UPPER AUSTRIA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Androsch, Franz Oberneukirchen, AT 1 4
Eyssell, Carola Linz, AT 3 7
Strauss, Bernhard Leonding, AT 7 31
Walch, Christian Leonding, AT 5 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 14, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00