Parallel resonant converter capable of controlling output voltage and control method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9564825
APP PUB NO 20150103564A1
SERIAL NO

14497306

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A parallel resonant converter including a control circuit and at least two resonant conversion circuits connected in parallel between an input bus and an output bus is provided by the invention. The control circuit is configured to provide a switching frequency signal to the at least two resonant conversion circuits. Moreover, the control circuit is further configured to control the voltage of the output bus to linearly vary along with the switching frequency signal in a rated range by using a linear current-balancing curve (gain-frequency), and thus achieving the purpose of current-balancing for the at least two resonant conversion circuits. The invention is capable of controlling the output voltage of the parallel resonant converter, so as to reduce the ripple on the output voltage of the power supply system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FSP TECHNOLOGY INCNO 22 JIANGUO E RD TAOYUAN CITY TAOYUAN COUNTY 330
FSP-POWERLAND TECHNOLOGY INC4TH FLOOR BUILDING 7 R&D REGION I XUZHUANG SOFTWARE INDUSTRIAL BASE # 699-8 XUANWU AVENUE XUANWU DISTRIAL NANJING 210042

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Duan, Fei-Yue Nanjing, CN 3 27
Xu, Ming Nanjing, CN 491 9425

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 7, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00