Replaceable panel structure and socket, switch and humidity sensor with replaceable panel

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9564745
APP PUB NO 20170025837A1
SERIAL NO

14952425

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A replaceable panel structure and a socket, switch and humidity sensor with the replaceable panel. The replaceable panel structure includes a base, and a panel main body which is replaceably mounted on the base by a snap structure having first snap structures and second snap structures, wherein each of the first snap structures includes a first elastic snap disposed on the panel main body and a stop block disposed on the base, a first slot fitted with the first elastic snap being formed on one side of the stop block away from the panel main body, the first elastic snap being deformed due to the stop of the stop block and then snapped into or released from the first slot; each of the second snap structures includes a second snap disposed on the panel main body and a second slot disposed on the base and fitted with the second snap, the second snap being able to be inserted into or released from the second slot in a horizontal direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENERLITES INC1781 MCGAW AVE IRVINE CA 92614

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gao, Wei Yueqing, CN 459 3897
Ni, Lidong Yueqing, CN 66 1019

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 7, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00