NOR flash device manufacturing method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9564336
APP PUB NO 20140154878A1
SERIAL NO

14130460

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An embodiment of a NOR Flash device manufacturing method includes: providing a substrate having a first polycrystalline silicon layer disposed thereon; forming a first hard mask layer on the first polycrystalline silicon layer; etching the first hard mask layer to form a first opening, and cleaning a gas pipeline connected to an etching cavity before etching the first hard mask layer; forming a second hard mask layer on the first hard mask layer, and the second hard mask layer covers the bottom and side wall of the first opening; etching the second hard mask layer to form a second opening, the width of the second opening is smaller than the width of the first opening; etching the first polycrystalline silicon, forming a floating gate. The NOR Flash device manufacturing method improves the yield of the NOR Flash device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CSMC TECHNOLOGIES FAB2 CO LTD214028 NO 8 XINZHOU ROAD NATIONAL HI TECH INDUSTRIAL DEVELOPMENT ZONE WUXI JIANGSU WUXI CITY JIANGSU PROVINCE 214028

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Yawei Jiangsu, CN 9 1
Jian, Zhihong Jiangsu, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 7, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00