Ion implanter and method of controlling the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9564289
APP PUB NO 20160013014A1
SERIAL NO

14793265

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An ion implanter includes a high-voltage power supply, a control unit that generates a command signal controlling an output voltage of the high-voltage power supply, an electrode unit to which the output voltage is applied, and a measurement unit that measures an actual voltage applied to the electrode unit. The control unit includes a first generation section that generates a first command signal for allowing the high-voltage power supply to output a target voltage, a second generation section that generates a second command signal for complementing the first command signal so that the actual voltage measured by the measurement unit becomes or close to the target voltage, and a command section that brings to the high-voltage power supply a synthetics command signal which is produced by synthesizing the first command signal and the second command signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO HEAVY INDUSTRIES ION TECHNOLOGY CO LTD1-1 OSAKI 2-CHOME SHINAGAWA-KU TOKYO 141-6025

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kagawa, Tadanobu Ehime, JP 3 14
Kurose, Takeshi Ehime, JP 5 27
Yumiyama, Toshio Ehime, JP 9 70

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 7, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00