Method to manufacture an optoelectronic assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9563028
APP PUB NO 20150323748A1
SERIAL NO

14806910

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method to manufacture an optoelectronic assembly comprises a step of structuring a first wafer to provide a plurality of optical components to change a beam of light in the optoelectronic assembly with a respective alignment structure being formed to couple the respective optical component to an optical connector. A second wafer is provided with a plurality of optoelectronic components. The first and second wafer are stacked on top of each other, aligned and bonded together. The bonded first and second wafers are separated into a plurality of optoelectronic modules. The optical connector is manufactured by structuring a third wafer so that the third wafer is provided with a plurality of optical connectors. The third wafer is separated into a plurality of the optical connectors. The optical fiber is coupled to one of the optical connectors and then is coupled to one of the separated optoelectronic modules.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CCS TECHNOLOGY INC103 FOULK ROAD SUITE 278-T WILMINGTON DE 19803

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Contag, Karsten Gilching, DE 10 45

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 7, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00