X-Y-Z pipe racker for a drilling rig

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9562407
SERIAL NO

14159722

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Apparatus and methods include an x-direction support structure extending in the same direction as a line extending between a well center and a V-door on a drilling rig and include a y-direction support structure moveable along the x-direction support structure. The y-direction support structure extends on a drilling rig in a direction transverse to the line extending between the well center and the V-door on the drilling rig. A racker device is carried by the y-direction support structure and is configured to connect to and carry a tubular stand used in a well drilling process, the racker device being moveable along the y-direction support structure from a position inline with the line extending between the well center and the V-door on the drilling rig to a position offline from the line to provide space for additional drilling processes along the line extending between the well center and the V-door on the drilling rig.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NABORS INDUSTRIES INC515 WEST GREENS ROAD SUITE 1200 HOUSTON TX 77067

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Magnuson, Christopher Houston, US 36 373

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 7, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00