Shunt tube connector assembly and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9562402
APP PUB NO 20150240572A1
SERIAL NO

14628386

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments of a shunt tube connector assembly generally include a jumper tube assembly and a cooperative shroud assembly. In one embodiment, the jumper tube assembly includes a jumper tube having two tube connectors slideable thereon, where the tube connectors are fluidly connectable to shunt tubes. In one embodiment, the shroud assembly includes shroud segments, and corresponding shroud connection collars that include openings for shunt tubes and a transverse dove tail in the surface thereof, where shroud segments have a dove pin extending inwardly therefrom and adapted to engage a collar dove tail. Embodiments of a method for connecting and shrouding connectable pipe segments equipped with exterior shunt tubes generally include providing fluidly connected pipe segments having collars comprising an exterior surface opened dove tail, fluidly connecting shunt tubes, and attaching shroud segments around at least a portion of each said pipe segment by engaging a dove pin with the dovetail.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DELTA SCREEN & FILTRATION LLC6649 N ELDRIDGE PKWY HOUSTON TX 77041

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Vu, Phong Houston, US 26 136

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 7, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00