Combustion process for the reduction of particulates in combustion fumes

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9562205
APP PUB NO 20100261126A1
SERIAL NO

12744591

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combustion process wherein a fuel, a comburent and component A) are fed to a combustor, component A), comprising low-melting salts and/or oxides having a melting temperature ≦1,450 K, the ratio by moles A′/(A″−A′)≧0.01, being: A′ the sum by moles between the amount of metals, under the form of low-melting salts and/or low-melting oxides present in the component A) and the amount of metals under the form of the low-melting salts and/or low-melting oxides or their low-melting mixtures, contained in the fuel, A″ is the sum of the amount of all the metals contained in the fuel and of those contained in component A), in which the combustor is isothermal type and flameless.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ITEA S P AVIA CONSERVATORIO 17 MILANO I-20122

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Di, Salvia Grazia Bari, IT 8 10
Malavasi, Massimo Milan, IT 13 204
Rossetti, Edoardo Bologna, IT 20 418

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 7, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00