Torrefaction reactor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9562194
APP PUB NO 20150225649A1
SERIAL NO

14178097

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A torrefaction reactor includes a preheater section and a torrefaction section arranged to receive the biomass material from the preheater section. The preheater section includes a plurality of preheater plates arranged to facilitate the flow of the biomass material between the preheater plates by the force of gravity, each of the preheater plates facilitates a flow of a preheater fluid through the preheater plate for heating the biomass material. The torrefaction section includes a plurality of torrefaction plates arranged to facilitate the flow of the biomass material between the torrefaction plates by the force of gravity, each the torrefaction plates facilitates a flow of a torrefaction fluid through the torrefaction plate for heating the biomass material to the torrefaction temperature, and a first and second torrefaction purge gas openings to facilitate a flow of a torrefaction purge gas for providing an oxygen-depleted environment within the torrefaction section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOLEX THERMAL SCIENCE INCSUITE 250 4720-106 AVENUE SE CALGARY T2C 3G5

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Byman, Ashley Dean De Winton, CA 5 23
Kellens, Marc Jules Adelin Ghislain Muizen, BE 2 10
Skold, Farah Calgary, CA 2 10
Van, Bommel Bernhard George Hoogerheide, NL 4 52

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 7, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00