Method for manufacturing superconducting wire, and superconducting wire

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9558873
APP PUB NO 20150005175A1
SERIAL NO

14376325

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a superconducting wire material in which the superconducting current is not saturated even when a superconducting layer is made into a thick film, and a superconducting wire material. In the method a superconducting layer is formed on a metal substrate interposed by an intermediate layer, the method including heating the metal substrate up to the film-formation temperature of a superconducting film for forming the superconducting layer, forming a superconducting film having a film thickness of at least 10 nm and no more than 200 nm on the intermediate layer, and reducing the metal substrate temperature to a level below the film-formation temperature of the superconducting film, and the superconducting film-formation, including the heating, the film-formation, and the cooling, are performed a plurality of times.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FURUKAWA ELECTRIC CO LTD6-4 OTEMACHI 2-CHOME CHIYODA-KU TOKYO 1008322 ?1008322
CHUBU ELECTRIC POWER COMPANY INCORPORATED1 HIGASHI-SHINCHO HIGASHI-KU NAGOYA AICHI 461-8680

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kashima, Naoji Nagoya, JP 15 51
Nagaya, Shigeo Nagoya, JP 28 109
Nakai, Akinobu Tokyo, JP 5 6
Nakasaki, Ryusuke Tokyo, JP 3 11
Watanabe, Tomonori Nagoya, JP 112 441

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 31, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00