sintered pellets and electrolytic reduction using same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9558853
APP PUB NO 20130148774A1
SERIAL NO

13712189

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for fabricating porous UO2 sintered pellets to be fed into the electrolytic reduction process for the purpose of metallic nuclear fuel recovery is provided, which includes forming a powder containing U3O8 by oxidizing spent nuclear fuel containing uranium dioxide (UO2) (step 1), fabricating green pellets by compacting the powder formed in step 1 (step 2), fabricating UO2+x sintered pellets by sintering the porous U3O8 green pellets fabricated in step 2 at 1200 to 1600° C., in an atmospheric gas (step 3), and forming UO2 sintered pellets by cooling the UO2+x sintered pellets to room temperature, and reduction the same at 1000 to 1400° C., in a reducing atmosphere (step 4).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA ATOMIC ENERGY RESEARCH INSTITUTEDAEJEON KOREA
KOREA HYDRO AND NUCLEAR POWER CO LTD(SEONGDONG-DONG) 125 HWARANG-RO GYEONGJU-SI GYEONGSANGBUK-DO 780-947

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Ho-Dong Daejeon, KR 65 792
Kim, Ki Hong Daejeon, KR 157 1287
Na, Sang-Ho Daejeon, KR 3 4
Shin, Hee-Sung Daejeon, KR 4 5
Song, Dae-Yong Chungcheongbuk-do, KR 3 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 31, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00