Method and system for construction of a building

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9556632
APP PUB NO 20140352232A1
SERIAL NO

14373722

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for providing at least a part of a building includes the steps of prefabricating a module by assembling four walls extending between a floor and a roof to form a rectangular cuboid shape; providing at least one compartment within the cuboid shape; providing waterproof layers on the interior walls and floor of the compartment for creating a wet area within the module; arranging technical installations within the cuboid shape; and providing interior equipment within the cuboid shape. The method further includes the steps of prefabricating a plurality of panels and slabs; and connecting these panels and slabs to a lateral side of the module for providing a further rectangular cuboid shape forming a panel-built room.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTER HOSPITALITY HOLDING B VHETTENHEUVELWEG 51 AMSTERDAM ZUIDOOST NL-1101

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Andersson, Erik Roger Konstancin Jeziorna, PL 4 67
Baltramiejunas, Marius Amstelveen, NL 4 67
Hattig, Thomas Berlin, DE 4 67
Malakauskas, Giedrius Amsterdam, NL 6 71
Muller, Harald Dieter Gdansk, PL 3 62
Muller, Philip Gdansk, PL 13 146
Sodemann, Steen Torben Leuven, BE 4 67

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 31, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00