Die, process for producing die, and process for producing antireflection film

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9556532
APP PUB NO 20120318772A1
SERIAL NO

13582033

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method is provided for manufacturing a mold that has a porous alumina layer over its surface, which is capable of preventing formation of pits (recesses). A moth-eye mold manufacturing method of an embodiment of the present invention is a method for manufacturing a mold which has a porous alumina layer over its surface, including the steps of: providing a mold base which includes an aluminum base and an aluminum film deposited on a surface of the aluminum base, the aluminum film having a purity of not less than 99.99 mass %; anodizing a surface of the aluminum film to form a porous alumina layer which has a plurality of minute recessed portions; and bringing the porous alumina layer into contact with an etching solution to enlarge the plurality of minute recessed portions of the porous alumina layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHARP KABUSHIKI KAISHA1 TAKUMI-CHO SAKAI-KU SAKAI CITY OSAKA 5908522 ?5908522

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hayashi, Hidekazu Osaka, JP 98 670
Ihara, Ichirou Osaka, JP 1 26
Isurugi, Akinobu Osaka, JP 21 142
Minoura, Kiyoshi Osaka, JP 233 1329
Nakamatsu, Kenichiro Osaka, JP 28 70

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 31, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00