Metal complex compound, hydrogen production catalyst and hydrogenation reaction catalyst each comprising the metal complex compound, and hydrogen production method and hydrogenation method each using the catalyst

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9556211
APP PUB NO 20130244865A1
SERIAL NO

13989229

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a catalyst for producing hydrogen, which catalyst has higher performance than conventional catalysts since, for example, it exhibits a certain high level of activity in an aqueous formic acid solution at high concentration even without addition of a solvent, amine and/or the like. The metal phosphine complex is a metal phosphine complex represented by General Formula (1): MHm(CO)Ln, wherein M represents an iridium, iron, rhodium or ruthenium atom; in cases where M is an iridium or rhodium atom, m=3 and n=2, and in cases where M is an iron or ruthenium atom, m=2 and n=3; and the number n of Ls each independently represent a tri-substituted phosphine represented by General Formula (2): PR1R2R3. The catalyst for producing hydrogen comprises the metal phosphine complex as a constituent component.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NATIONAL UNIVERSITY CORPORATION OKAYAMA UNIVERSITY1-1 TSUSHIMA-NAKA 1-CHOME OKAYAMA-SHI OKAYAMA 770-8530

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Muranaka, Makoto Okayama, JP 14 28
Oshiki, Toshiyuki Okayama, JP 7 148

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 31, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00