Fluidized bed contaminant separator and water-control loop for a fuel reactant stream of a fuel cell

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9553323
SERIAL NO

13263148

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fluidized contaminant separator and water-control loop (10) decontaminates a fuel reactant stream of a fuel cell (12). Water passes over surfaces of an ammonia dissolving media (61) within a fluidized bed (62) while the fuel reactant stream simultaneously passes over the surfaces to dissolve contaminants from the fuel reactant stream into a separated contaminant and water stream. A fuel-control heat exchanger (57) upstream from the scrubber (58) removes heat from the fuel stream. A water-control loop (78) directs flow of the separated contaminants and water stream from an accumulator (68) through an ion exchange bed (88) which removes contaminants from the stream. Decontaminated water is directed back into the scrubber (58) to flow through the fluidized bed (62). Separating contaminants from the fuel reactant stream and then isolating and concentrating the separated contaminants within the ion exchange material (88) minimizes costs and maintenance requirements.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HYAXIOM INC101 EAST RIVER DRIVE EAST HARTFORD CT 06108

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hanrahan, Paul R Farmington, US 78 240
Hildreth, Derek W Manchester, US 10 78
Isom, Joshua D South Windsor, US 22 174
Preston, John L Hebron, US 11 24
Reni, Lynn Vernon, US 2 1
VanDine, Leslie L Manchester, US 10 215

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 24, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00