Chip stack structure using conductive film bridge adhesive technology

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9553073
APP PUB NO 20150187735A1
SERIAL NO

14256776

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A chip stack structure using conductive film bridge adhesive technology comprises a substrate, a first chip, at least one bridge element, a conductive film, and a second chip. The first chip is electrically connected to a first electrode of the substrate. The at least one bridge element has a first bridge surface and a second bridge surface at two ends, and the first bridge surface and the second bridge surface are electrically connected to the first chip and a second electrode of the substrate, respectively. The conductive film is electrically connected to the first bridge surface of the at least one bridge element. The second chip is stacked and electrically connected to the conductive film. Thus, the structure of the present invention not only facilitates the ease of stacking the chips but also increases the effectiveness of the chips heat dissipation and ability of withstanding electrical current.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LINGSEN PRECISION INDUSTRIES LTDT E P Z

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liao, Chien-Ko Taichung, TW 18 53
Lin, Tzu-Chih Taichung, TW 49 313

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 24, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00