Composite conductive material, power storage device, conductive dispersion, conductive device, conductive composite and thermally conductive composite

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9552900
APP PUB NO 20160180981A1
SERIAL NO

14968882

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A composite conductive material includes at least graphene-like exfoliated from a graphite-based graphite carbon material and a conductive material dispersed in a base material. The graphite-based carbon material has a rhombohedral graphite layer (3R) and a hexagonal graphite layer (2H), wherein a Rate (3R) of the rhombohedral graphite layer (3R) and the hexagonal graphite layer (2H), based on an X-ray diffraction method, which is defined by following Equation 1 is 31% or more:

description='In-line Formulae' end='lead'Rate(3R)=P3/(P3+P4)×100  (Equation 1)description='In-line Formulae' end='tail'

wherein

    P3 is a peak intensity of a (101) plane of the rhombohedral graphite layer (3R) based on the X-ray diffraction method, andP4 is a peak intensity of a (101) plane of the hexagonal graphite layer (2H) based on the X-ray diffraction method.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GRAPHENE PLATFORM CORPORATION1-15-1 EBISU-MINAMI SHIBUYA-KU TOKYO 150-0022

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hasegawa, Shoji Tokyo, JP 27 437
Kamiya, Nagisa Tokyo, JP 13 309

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 24, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00