Zero drift, limitless and adjustable reference voltage generation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9552003
APP PUB NO 20160299519A1
SERIAL NO

15094459

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A circuit for generation of a reference voltage for an electronic system, which circuit comprises at least one digital buffer (U21, U31, U32, U41, U51), a low pass filter (R21, C21; R31, C31; R41, C41; R51, C51) and an operational amplifier (OA21, OA31, OA41, OA51)), which circuit is adapted to revive an input in the form of a bandgap reference voltage into the digital buffer, which digital buffer is adapted to receive a digital input from a Pulse Width Modulated (PWM) signal, which digital buffer is adapted to generate an output signal adapted to be fed to the low pass filter, which output signal after filtration is adapted to be fed to a positive input terminal of the operational amplifier, which operational amplifier comprises a feedback circuit, which feedback circuit comprises at least one capacitor (C22, C32, C44, C54) adapted to be connected from an output terminal of the operational amplifier towards a negative input terminal of the operational amplifier so as to form an integrator, wherein the feedback circuit further comprises at least one chopped signal path (R22, S21; R33, R34, S32; R33, R35, C35, S31), which chopped signal is adapted to be modulated by the output signal of the digital buffer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PR ELECTRONICS A/SLERBAKKEN 10 RONDE DK-8410

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lindemann, Stig Alnøe Højbjerg, DK 9 16
Madsen, Dan Vinge Risskov, DK 3 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 24, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00