Method for the production of an SCR-active zeolite catalyst, and SCR-active zeolite catalyst

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9550182
APP PUB NO 20120208692A1
SERIAL NO

13392960

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An SCR-active zeolite catalyst and a method for producing same. To produce the catalyst, an Fe ion-exchanged zeolite is initially subjected to a first temperature treatment within a range of 300 to 600° C. in a reducing hydrocarbon atmosphere such that the oxidation state of the Fe ions decreases and/or the dispersity of the Fe ions on the zeolite increases, whereupon the reduced zeolite is subjected to a second temperature treatment within a range of 300 to 600° C. in an oxidizing atmosphere such that hydrocarbon residues or carbon residues are oxidatively removed, the zeolite being calcined to obtain a catalyst material during the two temperature treatments. Iron contained in the zeolite is stabilized in an oxidation state of less than +3 and/or the dispersity of the Fe ions on the zeolite is permanently increased such that a high SCR activity is achieved within a temperature range of less than 300° C.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JOHNSON MATTHEY CATALYSTS (GERMANY) GMBH96257 REDWITZ AN DER RODACH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dotzel, Ralf Nuremberg, DE 31 371
Munch, Jorg Werner Lichtenfels, DE 1 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 24, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00