Control system, transformer, protection control apparatus, and bit stream storage unit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9548606
APP PUB NO 20130006433A1
SERIAL NO

13610447

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one embodiment, the A/D conversion unit includes a ΔΣ modulating device which samples the analog electric quantity provided by the electric power system with a predetermined modulation frequency and outputs a bit stream changing over time of single bit obtained by performing ΔΣ modulation, and the digital operation processing unit includes one or more digital filters which inputs the bit stream from the ΔΣ modulating device and of which frequency characteristics differ according to a type of protection control operation, and one or more operation processing elements which perform different kinds of protection control operation processing, based on the bit stream provided by the digital filter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NATIONAL UNIVERSITY CORPORATION NAGOYA INSTITUTE OF TECHNOLOGYAICHI
TOSHIBA ENERGY SYSTEMS & SOLUTIONS CORPORATION72-34 HORIKAWA-CHO SAIWAI-KU KAWASAKI-SHI KANAGAWA 2120013 JAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hirano, Satoshi Nagoya, JP 154 1992
Itagaki, Daiju Tokorozawa, JP 2 5
Miura, Shogo Tokyo, JP 7 33
Sekiguchi, Katsuhiko Tama, JP 13 220

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 17, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00