Managing the manufacturing lifecycle of fasteners of a product

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9547303
APP PUB NO 20150112468A1
SERIAL NO

14056983

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system is provided that is configured to receive a manufacturing process plan for a product including a plurality of component parts joined by fasteners, with the manufacturing process plan including process definitions that describe process operations in which component parts are worked to manufacture of the product. The system is configured to generate graphical views for respective process operations of the manufacturing process plan in which fastener locations are worked for installation of respective fasteners to join component parts of the product, and output the graphical views. The graphical view of a process operation may graphically depict one or more component parts and only those of the fastener locations on the one or more component parts worked during the process operation, with any others of the fastener locations on the same or other component parts being hidden from the graphical view.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE BOEING COMPANY100 N RIVERSIDE PLAZA CHICAGO IL 60606-1596

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Carpenter, Christopher L Bothell, US 15 116
Rudnick,, III Fredrick C Shoreline, US 2 23
Williams, Anthony J Mill Creek, US 12 243

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 17, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00