Lubrication system for a gate valve

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9541202
APP PUB NO 20140353085A1
SERIAL NO

14295038

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A lubrication system for a gate valve having a moveable gate and a gate sealing element located between first and second housing sections. The lubrication system includes a cartridge having a lubricant for lubricating the gate sealing element. The lubrication system also includes a plunger element for moving the lubricant from the cartridge to the gate sealing element. In addition, the lubrication system includes a lubricant passageway located between the plunger element and the gate sealing element for supplying the lubricant moved by the plunger element to the gate sealing element. Further, the lubrication system includes a plunger contact member attached to the gate by an attachment element wherein the plunger contact element engages the plunger element. Energizing an actuator causes movement of the gate and corresponding movement of the plunger element to cause the lubricant to move from the cartridge to the gate sealing element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EMERSON VULCAN HOLDING LLC8000 W FLORISSANT AVENUE ST LOUIS MO 63136

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kelley, John D Reno, US 2 1
Moore, Kirk W Reno, US 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 10, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00