Concentrated solar power plant with independent superheater

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9541071
APP PUB NO 20140152024A1
SERIAL NO

14092130

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Steam can be generated using insolation by a solar collection system. A thermal storage system can store enthalpy in insolation-generated steam at times and can generate steam from stored enthalpy at other times. During some operating periods, a gas-fired superheater can further heat the generated steam to provide superheated steam to generate electricity. Steam at a substantially uniform electricity generating temperature may be produced selectively and at different operating periods from insolation only, from insolation and gas firing, from transfer of enthalpy from a thermal storage system and gas firing, or from a combination of insolation, stored enthalpy transfer, and gas firing. Operating periods can be characterized by at least one of an insolation level, a time of day, or a stage in the operation process. The generated steam can be used in the production of electricity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BRIGHTSOURCE INDUSTRIES (ISRAEL) LTD11 KIRYAT MADA STREET AMOT BLDG #6 P O BOX 45220 HAR HOTZVIM JERUSALEM 91450

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kroizer, Israel Jerusalem, IL 24 398

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 10, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00