Energy storage power plant and method for operating such a power plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9534508
APP PUB NO 20150027122A1
SERIAL NO

14382315

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An energy storage power plant for harvesting electric energy, and suitable for converting electric energy into thermal energy is provided. The thermal energy can be temporarily stored in at least two thermal stores until demanded and retrieved to increase the energy content of water in a water circuit upon demand. The power plant has the at least two thermal stores, each has at least one converting device that allows electric energy to be directly or indirectly converted into thermal energy, the thermal stores being thermally chargeable by temporarily storing thermal energy, wherein one thermal store is for storing sensible heat and one thermal store is for storing latent heat; and at least one energy generating unit operated using the water in the water circuit, the energy content of the water having been increased by the temporary storage of thermal energy, in order to generate electric energy when operated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS ENERGY GLOBAL GMBH & CO KGOTTO-HAHN-RING 6 MÜNCHEN 81739

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brunhuber, Christian Auerbach, DE 26 63
Graeber, Carsten Erlangen, DE 27 53
Zimmermann, Gerhard Hochstadt/Aisch, DE 42 323

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 3, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00