Hard-coated tool and its production method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9534292
APP PUB NO 20150240353A1
SERIAL NO

14428397

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hard-coated tool comprising a titanium carbonitride layer formed directly on a WC-based cemented carbide substrate by a chemical vapor deposition method; the titanium carbonitride layer having a composition comprising 74-81% by mass of titanium, 13-16% by mass of carbon and 6-10% by mass of nitrogen; the titanium carbonitride layer having a structure comprising columnar crystal grains having an average transverse cross section diameter of 0.01-0.22 μm; a layer of W diffused from the substrate to the titanium carbonitride layer having an average thickness of 30-200 nm; and the titanium carbonitride layer having an X-ray diffraction peak of a (422) plane in a 2θ range of 122.7-123.7°.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI TOOL ENGINEERING LTD2-1 SHIBAURA 1-CHOME MINATO-KU TOKYO 1050023 ?1050023

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukunaga, Yuuzoh Narita, JP 7 18
Inoue, Kenichi Matsue, JP 148 1457
Koseki, Syuuhou Matsue, JP 1 4
Kubota, Kazuyuki Narita, JP 65 403

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 3, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00