Crimp terminal, connection structural body, and method of manufacturing connection structural body

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9531088
APP PUB NO 20150333416A1
SERIAL NO

14807403

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A barrel portion which allows the pressure-bonding connection of an aluminum core wire exposed on a distal end of an insulated wire covered with an insulating cover is formed into a cylindrical shape by bending barrel portion corresponding portions of a terminal base material in a terminal developed state about a terminal axis. In abutting end portions where the barrel portion corresponding portions abut each other, a welded part which welds the end portions is formed along a long length direction of the insulated wire. The welded part is formed on an upper surface concave portion and a projecting portion where an amount of plastic deformation of a conductor pressure-bonding section generated along with the pressure-bonding of the conductor pressure-bonding section becomes larger compared to other portions in a circumferential direction of the conductor pressure-bonding section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FURUKAWA ELECTRIC CO LTDJAPAN TOKYO CHIYODA TOKYO TOKYO METROPOLIS
FURUKAWA AUTOMOTIVE SYSTEMS INCSHIGA SHIGA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kawamura, Yukihiro Inukami-gun, JP 75 581
Kihara, Yasushi Tokyo, JP 19 123
Tachibana, Akira Tokyo, JP 39 373
Tonoike, Takashi Inukami-gun, JP 27 182
Yagi, Saburo Tokyo, JP 13 121

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00