Systems and methods for managing hydrocarbon material producing wellsites using clamp-on flow meters

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9528362
APP PUB NO 20140102697A1
SERIAL NO

14055536

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and system for managing one or more hydrocarbon producing well sites is provided. The well site includes a hydrocarbon material flow passing through a pipe. The system includes a clamp-on flow meter and a control station. The clamp-on flow meter is operable to produce output indicative of at least one characteristic of the hydrocarbon material flowing through the pipe at the well site. The control station is separately located from the well site. The control station includes at least one processor adapted to receive the output from the clamp-on flow meter. The processor is adapted to determine one or more characteristics of the hydrocarbon material flow at each well site using a flow compositional model.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EXPRO METERS INC50 BARNES PARK NORTH WALLINGFORD CT 06492

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Curry, Patrick Glastonbury, US 12 274
Dragnea, Gabriel Thornton, US 8 95
Sapack, Michael Southbury, US 3 2
Sridhar, Siddesh Meriden, US 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00