Brush-less motor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9525326
APP PUB NO 20150256053A1
SERIAL NO

14718076

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A brush-less motor is disclosed, comprising a stator, a rotor, a plurality of field-effect tubes, a commutation circuit board, a control circuit board and a motor end cap, wherein the motor end cap comprises a front end cap and a rear end cap which are mutually fixedly connected to form an integrated motor; the plurality of field-effect tubes is directly fixed at the motor front end cap; the commutation circuit board and the control circuit board are both connected to the motor front end cap. The field-effect tubes of the brush-less motor are directly installed on a housing of the motor, ensuring good heat dissipation, saving heat sinks and cost; the integrated brush-less motor runs more smoothly and imposes requirements which are not as high as those imposed by the split brush-less motor on the accuracy of the housing. Thus, the reject ratio of products during batch production is reduced.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GLOBE (JIANGSU) CO LTDZHONGLOU DISTRICT CHANGZHOU JIANGSU 213023

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Yin Changzhou, CN 119 1501
Wang, Qiang Changzhou, CN 762 5596
Xia, Ranran Changzhou, CN 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00