Energy systems and energy supply methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9525285
SERIAL NO

13495935

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Energy systems and energy supply methods are described. In one aspect, an energy system includes a bus system configured to conduct electrical energy, a plurality of input adapters electrically coupled with the bus system and configured to electrically couple with a plurality of respective source entities which are individually configured to provide electrical energy, a plurality of output adapters electrically coupled with the bus system and configured to electrically couple with a plurality of respective consuming entities which are individually configured to consume electrical energy, and control circuitry configured to control individual ones of the input adapters to provide electrical energy from respective ones of the source entities to the bus system and to control individual ones of the output adapters to provide electrical energy from the bus system to respective ones of the consuming entities.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENEL X NORTH AMERICA INCONE MARINA PARK DRIVE SUITE 400 BOSTON MA 02210

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Coxon, Allan Ford, US 4 26
Johnson, Shane Rosalia, US 12 266
Walker, Ian Spokane, US 15 51

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00