Solar module employing quantum luminescent lateral transfer concentrator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9525092
SERIAL NO

13287407

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solar concentrator module (80) employs a luminescent concentrator material (82) between photovoltaic cells (86) having their charge-carrier separation junctions (90) parallel to front surfaces (88) of photovoltaic material 84 of the photovoltaic cells (86). Intercell areas (78) covered by the luminescent concentrator material (82) occupy from 2 to 50% of the total surface area of the solar concentrator modules (80). The luminescent concentrator material (82) preferably employs quantum dot heterostructures, and the photovoltaic cells (86) preferably employ low-cost high-efficiency photovoltaic materials (84), such as silicon-based photovoltaic materials.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OSRAM OPTO SEMICONDUCTORS GMBH93055 REGENSBURG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Guichard, Alex R Durham, US 8 126
Hughes, Steven M Hillsboro, US 20 240
Kurtin, Juanita N Hillsboro, US 52 542
Masson, Georgeta Lafayette, US 27 291
Mayer, Alex C San Francisco, US 7 124
Park, Oun Ho San Jose, US 10 146
Reese, Colin C Portland, US 8 139
Scully, Shawn R San Francisco, US 15 179
Sheoran, Manav Beverly, US 6 119
Trudeau, Paul-Emile B Portland, US 5 119

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00