Systems and methods for building axes, co-axes and paleo-geographic coordinates related to a stratified geological volume

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9524590
SERIAL NO

14987158

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method, apparatus and system for, in a computing system, modeling a subsurface structure at a time period when the structure was originally formed. A memory may store a first model having a plurality of non-planar horizons representing a current state of the subsurface structure. A processor may compute a vector field based on the non-planar geometry of the horizons of the first model. The vector field may be a non-uniform vector field (e.g., the axe and/or co-axe vector field) or a uniform vector field (e.g., a global axis). Using the vector field, the processor may transform geographic coordinates of the first model to paleo-geographic coordinates of a second model representing a predicted state of the subsurface structure at a time period when the subsurface structure was originally formed, where the non-planar horizons in the first model are transformed to planar horizons in the second model. A display may display the first model.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ASPEN PARADIGM HOLDING LLC6005 ROGERDALE ROAD HOUSTON TX 77024

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mallet, Jean-Laurent Luxembourg-Beggen, LU 35 711

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00