Polymeric coil assembly and method of making the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9523542
APP PUB NO 20160054076A1
SERIAL NO

14782462

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Coil assemblies for use in heat exchange applications are made using polymeric tubes, some with heat exchange and water redistribution media integral with the coil assembly and others with a water distribution subassembly integral with the coil assembly. One coil assembly includes at least two generally linear passes that are connected by return bends formed by folding an array of polymeric tubes. The passes have an array of at least two layers of polymeric tubes that pass through alignment holes in tube spacers only along the passes to maintain the tubes in substantially the same relative positional relationship to each other in the passes and in the return bends. Methods are explained for forming the coil assemblies and components, including the tube spacers and tube sheets to connect the coil assembly to inlet and outlet manifolds for the processing fluid flowing internally through the tubes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BRENTWOOD INDUSTRIES INCP O BOX 605 READING PA 19603

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Calton, Dean La Vernia, US 5 133
Krell, Timothy E Mohrsville, US 11 107
Kulick,, III Frank M Leesport, US 20 138

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00