based catalysts and use thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9522968
APP PUB NO 20140148566A1
SERIAL NO

14082595

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Improved Ziegler-Natta catalysts and methods of making the improved catalyst are described. The Ziegler-Natta catalyst is formed using a spherical MgCl2-xROH support, where R is a linear, cyclic or branched hydrocarbon unit with 1-10 carbon atoms and where ROH is an alcohol or a mixture of at least two different alcohols and where x has a range of about 1.5 to 6.0, preferably about 2.5 to 4, more preferably about 2.9 to 3.4, and even more preferably 2.95 to 3.35. The Ziegler-Natta catalyst includes a Group 4-8 transition metal and an internal donor comprising a diether compound. The catalyst has improved activity in olefin polymerization reactions as well as good stereoregularity and hydrogen sensitivity, and may be useful in the production of phthalate-free propylene polymers having a molecular weight distribution (PI(GPC)) in the range from about 5.75 to about 9.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LUMMUS NOVOLEN TECHNOLOGY GMBH68165 MANNHEIM

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Denkwitz, Yvonne Mannheim, DE 7 16
Schuster, Oliver Weinheim, DE 22 134
Winter, Andreas Neuleininger, DE 220 6188

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00