Method for manufacturing a structure with cellular cores for a turbojet nacelle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9518509
APP PUB NO 20150267613A1
SERIAL NO

14635667

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure related to a method for manufacturing a structure with cellular cores that can be used in a structural panel of a turbojet nacelle, including at least one block of cellular cores. The at least one block of cellular cores includes a central portion with core honeycomb cells, and two side portions each including side honeycomb cells. The side honeycomb cells have edge honeycomb cells situated on edges of a side part of a block, and adjacent honeycomb cells. In particular, the method includes: A) forming junction walls on the side honeycomb cells by opening the edge honeycomb cells, the junction walls being capable of interacting for forming a junction area; B) unfolding the junction walls thus formed in step A; and C) joining the junction walls thus unfolded in step B and belonging to two different side portions end-to-end.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAFRAN NACELLESROUTE DU PONT VII GONFREVILLE-L'ORCHER 76700

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Deschamps, Thierry Heuqueville, FR 5 6
Desjoyeaux, Bertrand Sainte Adresse, FR 57 178
Moutier, John Le Havre, FR 8 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 13, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00