Condylar prosthesis for a temporo-mandibular joint

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9517135
APP PUB NO 20150182340A1
SERIAL NO

14419717

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The condylar prosthesis (10) for a temporo-mandibular joint includes a mandibular implant (12), which is intended to be rigidly attached to the branch of a mandible, and a joint head (16), which is intended to serve as a replacement mandibular condyle, the mandibular implant (12) including an anchoring stem (14) permitting the use of an intramedullary connection in the summit of the branch of the mandible, and the distal end of the anchoring stem (14) being offset towards the front of the prosthesis (10) with respect to the joint head (16) and in a median plane of the prosthesis (10), the condylar prosthesis (10) being characterized in that the anchoring stem (14) follows a curved profile along its length and in the median plane of the prosthesis, the direction of curvature of the anchoring stem being oriented towards the front of the prosthesis.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUEPARIS FRA
UNIVERSITE DE BORDEAUX35 PLACE PEY BERLAND BORDEAUX 33000
UNIVERSIDADE DE AVEIROCAMPUS UNIVERSITÁRIO DE SANTIAGO AVEIRO 3810-193

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mesnard, Michel Bordeaux, FR 2 4
Ramos, Antonio Ilhavo, PT 3 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 13, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00