Method for extracting bitumen from an oil sand stream

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9512363
APP PUB NO 20140021103A1
SERIAL NO

13943580

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a method for extracting bitumen from an oil sand stream, the method including at least the steps of: (a) providing an oil sand stream; (b) contacting the oil sand stream with a liquid comprising a non-aqueous solvent thereby obtaining a solvent-diluted oil sand slurry; (c) screening the solvent-diluted oil sand slurry thereby obtaining a screened oil sand slurry and a rejects stream; (d) introducing the rejects stream into a liquid bath; (e) transporting the rejects stream through the liquid bath to a space above the surface of the liquid bath; and (f) extracting bitumen from the screened oil sand slurry obtained in step (c).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CANADIAN NATURAL UPGRADING LIMITED100 855 2 STREET SW CALGARY ALBERTA T2P 4J8 CANADA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
House, Peter Kirkwood Calgary, CA 1 2
Kift, Julian Robert Reno, US 5 5
Ringstrom, John Patrick Calgary, CA 3 75

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00