Electric power control apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9507368
APP PUB NO 20140025214A1
SERIAL NO

13944045

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power control apparatus includes: a power supply device including multiple power supply elements; a power consumption device; a battery independently arranged from the power supply device and the power consumption device; a supply and consumption balance adjustment device for controlling the power supply device and the battery to supply the electric power to the power consumption device; a prediction device for predicting electric power supply from at least a part of multiple power supply elements and electric power consumption of the power consumption device; a guard value setting device for setting a guard value of a charging and discharging operation of the battery according to a prediction result of the prediction device; and an output device for outputting the guard value to the supply and consumption balance adjustment device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DENSO CORPORATION1-1 SHOWA-CHO KARIYA-CITY AICHI 4488661 ?4488661
AVAL NAGASAKI CORPORATION6-42 TSUKUBAMACHI ISAHAYA-CITY NAGASAKI-PREF 854-0065

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ito, Akira Nukata-gun, JP 521 5667
Muneishi, Hiroshi Nagasaki, JP 1 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 29, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00