Device for controlling thermal convection velocity of biochemical reaction and method for the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9505004
APP PUB NO 20150044726A1
SERIAL NO

14383905

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure is related to a device for controlling thermal convection velocity of a biochemical reaction. The thermal convection velocity controlling device includes a base body for disposing a tube which is movable, wherein the tube is filled with a buffer of the biochemical reaction; a heating source located at a bottom of the tube or at a side of the tube to heat the buffer; and a flow rate adjusting apparatus for controlling a thermal convection flow direction of the buffer in the tube, whereby the flow rate adjusting apparatus changes a flow velocity and a flow time of the buffer. The present disclosure is also related to a method for controlling thermal convection velocity of a biochemical reaction using the device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GENEREACH BIOTECHNOLOGY CORPNO 19 KEYUAN 2ND ROAD CENTRAL TAIWAN SCIENCE PARK TAICHUNG CITY 407

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jeng, Chien-Chung Taichung, TW 5 8
Su, Chen Taichung, TW 57 296
Teng, Ping-Hua Taichung, TW 10 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 29, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00