Ethernet communication system and method based on MMC/SD interface

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9503309
APP PUB NO 20130325994A1
SERIAL NO

13823852

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention is directed to an Ethernet communication method and system which are based on the MMC/SD interface. In the invention, the communication system includes at least one master device and at least one slave device, the at least one master device and the at least one slave device are connected via MMC/SD interface and communicate with each other on the Ethernet. The Ethernet communication method and system disclosed herein enables the device with the MMC/SD interface to act as a node in the network, and thus greatly expanding the application domain of such devices.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHINA UNIONPAY CO LTD200135 SHANGHAI PUDONG NEW AREA NO 36 SMILING ROAD UNIONPAY BUILDING SHANGHAI CITY SHANGHAI CITY 200135
EASTCOMPEACE SMART CARD CO LTD519060 GUANGDONG PROVINCE SCIENCE AND TECHNOLOGY PARK IN ZHUHAI NANPING PING GONG ROAD NO 8 ZHUHAI CITY GUANGDONG PROVINCE 519060

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chai, Hongfeng Shanghai, CN 26 159
Guo, Wei Shanghai, CN 345 2714
He, Shuo Shanghai, CN 37 188
Lu, Zhijun Shanghai, CN 52 198
Meng, Hongwen Shanghai, CN 10 169
Xu, Yunfeng Shanghai, CN 18 22
Zhou, Zhongguo Shanghai, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 22, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00