Burner and/or injector panel apparatus, methods of installation and use of the same in a metal-melting furnace, and metal-melting furnace including the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9500411
APP PUB NO 20150292801A1
SERIAL NO

14749052

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A burner and/or injector panel apparatus includes a flange rotatable within a cylindrical aperture in a horizontal plate and securely retainable between one or more retaining clips and the plate. Extending downward from the flange is a main body with a cylindrical chamber. A burner, burner/injector, or injector is contained within the cylindrical chamber. The main body has a helical cooling circuit extending around the cylindrical chamber and burner and/or injector. The burner and/or injector panel apparatus may be installed through a furnace wall, especially an electric arc furnace, more particularly, a balcony panel of a sump area of an electric arc furnace. The burner and/or injector panel apparatus may be tilted from horizontal or rotated around its vertical axis in order to better target a target area of a molten bath of metal with a flame, jet of oxygen, or stream of carbon particles.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AIR LIQUIDE ADVANCED TECHNOLOGIES U S LLCHOUSTON TEXAS 77024

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Eyfa, Yury Smyma, US 6 43

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 22, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00