Method for building green network

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9497031
APP PUB NO 20150207634A1
SERIAL NO

14421161

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a technique for building a green architecture for achieving efficient power saving in a Layer-2 network, the technique having: a packet collection process (S01) for collecting all broadcast packets communicated within the network and extracting packet information; a MAC-IP history generation process (S02) for generating MIPT with the latest timestamp from the packet information; an access analysis process (S03) for counting, on the basis of information about the MIPT, the number of packets per category of {SMAC, DMAC} in each time slot having a certain interval, and generating a MAcT; an L2 switch port analysis process (S04) for generating an MDMAcT on the basis of information about the MAcT; a green architecture building process (S05) for generating a GMDMAcT in which a port connection configuration of the MDMAcT has been updated; and a visualization process (S06) for displaying information about the GMDMAcT.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CYBER SOLUTIONS INC6-3 MINAMI-YOSHINARI 6-CHOME AOBA-KU SENDA I-S HI MIYAGI 9893204

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Keeni, Glenn Mansfield Miyagi, JP 9 51

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 15, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00