Multilayer ceramic capacitor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9496087
APP PUB NO 20150325373A1
SERIAL NO

14410561

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided a multilayer ceramic capacitor in which an increase in conductor resistance at an end of an internal electrode layer is suppressed, and in which a gap between the internal electrode layer and a dielectric layer is reduced. A multilayer ceramic capacitor includes a stacked body including dielectric layers and internal electrode layers alternately laminated; and an external electrode disposed on an end surface of the stacked body and connected to the internal electrode layers, the internal electrode layers each including a connection electrode portion connected to the external electrode, and an internal electrode portion which is connected to the connection electrode portion and extends toward an inner side of the stacked body, a ratio of a material having a melting point higher than that of a conductive material being higher in the connection electrode portion than in the internal electrode portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KYOCERA CORPORATIONKYOTO-SHI KYOTO 612-8501

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Satou, Hisashi Kyoto, JP 9 96

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 15, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00