Sub-rate codes within the 10GBASE-T frame structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9485335
SERIAL NO

13966208

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of operation in a high-speed Ethernet transceiver is disclosed. The method includes engaging in an autonegotiation process with a link partner transceiver to indicate whether one or more sub-rate modes of operation are supported. Each sub-rate mode of operation corresponds to a sub-data rate that is less than a maximum data rate. The autonegotiation process is terminated. The transceiver then participates in a training process. The training process includes receiving a first training sequence corresponding to a first sub-data rate that is less than the maximum data rate. A signal quality parameter for the received first training sequence is measured. The training sequence is terminated based on the measured signal quality parameter failing a predetermined criteria. A second training sequence is then initiated that corresponds to a second sub-data rate that is less than the first sub-data rate without starting a second autonegotiation process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MARVELL ASIA PTE LTDTAI SENG CENTRE 3 IRVING ROAD #10-01 SINGAPORE 369522

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Langner, Paul Fremont, US 38 427
Sedarat, Hossein San Jose, US 82 808

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 1, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00