Optically end-pumped slab amplifier comprising pump modules arranged in a distributed manner

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9484705
APP PUB NO 20150295380A1
SERIAL NO

14440643

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optically end-pumped amplifier with a plate-shaped optical gain medium has a plurality of pump laser units for optically pumping the gain medium through at least one of the narrow side surfaces thereof. The pump laser units are designed such that the pump laser radiation, upon passing through the gain medium, has an elongated beam cross section having a short axis and a long axis running parallel to the main surfaces of the gain medium and propagates freely through the gain medium with respect to the short axis. They are arranged such that in each case the principal axes of the beam bundles of the pump laser units impinge on one of the pumped side surfaces in a plane perpendicular to the short axis at an angle to one another, wherein the beam cross sections of the beam bundles are superimposed on one another.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RWTH AACHEN52062 AACHEN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rotarius, Guido Vaals, NL 1 2
Russbueldt, Peter Herzogenrath, DE 2 10
Sartorius, Thomas Aachen, DE 5 65
Weitenberg, Johannes Aachen, DE 3 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 1, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00