Semiconductor device and method of manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9484340
APP PUB NO 20160035719A1
SERIAL NO

14806749

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Both a HEMT and a SBD are formed on a nitride semiconductor substrate. The nitride semiconductor substrate comprises a HEMT gate structure region and an anode electrode region. A first laminated structure is formed at least in the HEMT gate structure region, and includes first to third nitride semiconductor layers. A second laminated structure is formed at least in a part of the anode electrode region, and includes first and second nitride semiconductor layers. The anode electrode contacts the front surface of the second nitride semiconductor layer. At least in a contact region in which the front surface of the second nitride semiconductor layer contacts the anode electrode, the front surface of the second nitride semiconductor layer is finished to be a surface by which the second nitride semiconductor layer forms a Schottky junction with the anode electrode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KABUSHIKI KAISHA TOYOTA CHUO KENKYUSHO;TOYOTA JIDOSHA KABUSHIKI KAISHA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kanechika, Masakazu Nagakute, JP 14 52
Tomita, Hidemoto Toyota, JP 28 323
Ueda, Hiroyuki Nagakute, JP 178 993

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 1, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00