Arrow construction system having tip canister electronics

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9482505
APP PUB NO 20140309064A1
SERIAL NO

14318240

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An arrow construction system comprising a tip canister configured to receive an arrow tip and to attach to an arrow shaft. The tip canister contains a power source and sensitive electronics. The power circuit may be a battery, a primary storage capacitor, a coil and a rectifier, and/or a solar cell. The tip canister may be electrically connected to the nock via the shaft electrical conduction system. The electrical conductors may be integrated into the shaft. The wires may form a cable with standard connectors. The nock may contain a light. Alternatively, the fletching may comprise light emitting film or fibers. The circuits may include a flash circuit, an audio circuit, a radio beacon, a wireless transmitter, environmental sensors, a camera, a switch, and/or a GPS device. The switch may be activated by a current detected in a coil or by an accelerometer.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EVRIO INC3277 KIFER ROAD SANTA CLARA CA 95051

International Classification(s)

  • 2014 Application Filing Year
  • A63B Class
  • 2009 Applications Filed
  • 1762 Patents Issued To-Date
  • 87.71 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances201420152016201720182019202020212022202320240255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Román, Kendyl Allen Sunnyvale, US 2 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 1 Citation Count
  • A63B Class
  • 13.60 % this patent is cited more than
  • 9 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges2541229222872823128211101 - 1011 - 2021 - 3031 - 4041 - 5051 - 6061 - 7071 - 8081 - 9091 - 100100 +01002003004005006007008009001000110012001300

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 1, 2028