Method for producing a panel sandwich

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9482004
APP PUB NO 20140311086A1
SERIAL NO

14129567

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a panel sandwich (2, 17, 40) for use as a wall, ceiling or floor panel (1, 16) comprising at least the following steps: providing a base panel (7, 20, 31) made of wood-based material, arranging a sound-insulating layer (9, 18) above the base panel (7, 20, 31), arranging a cover panel (11, 22, 38) above the base panel (7, 20, 31), pressing the sandwich, wherein an elastic plastic material is used to produce the sound-insulating layer (9, 18), wherein according to a first alternative of the invention, a closed-cell foam (9a) is arranged as the elastic plastic material, wherein the plastic material before being introduced into the sandwich panel has an elasticity modulus under pressure of 0.25 MPa to 1.5 MPa, according to a second alternative of the invention, the elastic plastic material applied is a self-adhesive plastic material (18c) which connects the base panel (20) to the cover panel (22), is elastic when set, has an elasticity modulus under pressure of 0.25 MPa to 1.5 MPa and has a minimum thickness of 0.3 mm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FLOORING TECHNOLOGIES LTDSMARTCITY MALTA SCM01 OFFICE 406 RICASOLI KALKARA SCM1001

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Braun, Roger Willisau, CH 38 1093

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 1, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00