Liquid Crystal compound containing cyclobutyl group and difluoromethyleneoxy linking group, and preparation method and use thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9481828
APP PUB NO 20150284632A1
SERIAL NO

14407271

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A liquid crystal compound containing cyclobutyl and a linking group difluoromethyleneoxy, and a preparation method and use thereof are disclosed. The compound is as shown in Formula I. The liquid crystal compound containing cyclobutyl as a terminal group and difluoromethyleneoxy (—CF2O—) as a linking group in the molecular structure of Formula I according to the present invention, has not only a high dielectric anisotropy, but also importantly an extremely fast response speed and a high clearing point, which are of great significance for the formulation of a liquid crystal mixture.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHIJIAZHUANG CHENGZHI YONGHUA DISPLAY MATERIALS CO LTD050091 HEBEI PROVINCE SHIJIAZHUANG CITY XINSHI NORTH ROAD NO 362 SHIJIAZHUANG CITY HEBEI PROVINCE 050091

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Han, Yaohua Hebei Province, CN 3 1
Hua, Ruimao Hebei Province, CN 10 17
Lv, Wenhai Hebei Province, CN 1 1
Qiao, Yunxia Hebei Province, CN 10 16
Wang, Jian Hebei Province, CN 1906 17240
Wang, Kui Hebei Province, CN 73 181
Yun, Guoliang Hebei Province, CN 36 58

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 1, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00